04.29.2021 Notice of Blowdown from TC Energy

TC Energy has two blowdowns planned for our area.  The first is scheduled from April 30-May 6, the second is scheduled from May 8-14.  Both will take place near Tecumseh Road and Hwy 3.  See the maps for exact locations. 

Map 1: April 30 May 6 PI 21 109 Blowdown Notification Receiver Map

Map 2: May 8 14 PI 21 110 Blowdown Notification Map Receiver

The sound during a blowdown can be as loud as an airplane engine and may last anywhere from a few minutes to multiple hours, depending on the amount of pipe being depressurized. As the flow of gas gradually slows down, the noise also lessens.

Residents living in close proximity to the planned blowdown location will receive notification of the blowdown prior to the work beginning.

For details, see the Blowdown Notification Fact Sheets.

Tags: Featured

Leave A Comment